Recent Projects
We are trained in General Motors GCCS ePlan and Hardware design principals. Recently we have been contracted to assist with the ePlan design for several of their new battery assembly lines.
Using AutoCAD electrical, this project involved several stations serviced by a 7 axis robot to pick required assembly parts via machine vision orientation which fed to a weld production line.
AutoCAD Electrical was used to design custom controls systems for one of our automotive customers three new weld cells.
We were contracted to audit an entire automotive production line to account for any undocumented changes to avoid confusion in the case of downtime or future modifications. The lines were inspected in detail between production downtimes followed by the updating of several drawing sets.
Panel design to accommodate the equipment required to convey the finished parts from the injection machine including conveyors, robots, and safety coordination.
Electrical design including system and panel drawings for offline repair and testing of seats in JIT process.
This lamination and edge fold list was designed using AutoCAD Electrical for system drawing and panel design.